We painted the doors, trim, exposed drywall and installed a 3 panel digital mural on all the walls in the corridors of Wild Horse Pass Development Authority main office at the Gila River Community. The walls were painted texture prior to the wall covering installation. We floated and sealed the walls to facilitate the wall covering install.
This is the lobby of the finished design on the first floor with the new wall coverings - complete with new pictures.
Art work was done by native American artists.
Art work was done by native American artists.
Art work was done by native American artists.
In preparation for the new digital mural we floated the old textured walls smooth and sealed for new wall coverings.
The doors were solid core stained mahogany. The door frames were hollow metal. The mahogany doors were primed with Benjamin Moore Stix primer to assure strong adhesion to the existing lacquer finish and finished with Benjamin Moore Scufx satin finish.
In the fitness center we installed a digital mural on all the walls
The view from the fitness center.